Put this calculator on your own site
Free to embed, on any site, with no permission needed. We ask for one thing: leave the attribution link in. Copy this:
<iframe src="https://landclearingandexcavation.com/tools/embed/land-clearing-cost-calculator/" width="100%" height="720" style="border:1px solid #ddd;border-radius:8px" loading="lazy" title="Estimate my clearing"></iframe>
<p><a href="https://landclearingandexcavation.com/tools/land-clearing-cost-calculator/">Calculator by LandClearingAndExcavation.com</a></p>
The embed is a plain iframe with no tracking scripts and no cookies. It works with JavaScript switched off, because the arithmetic runs on our server rather than in your visitor's browser.
How this calculator works
Clearing is quoted per acre, so the calculator works from a per-acre rate band for your vegetation type, then applies a method factor.
- Vegetation sets the base rate. Trunk diameter matters more than tree count — a machine that mulches six-inch stems will not touch a mature oak.
- Method decides what happens to the material. Mulching leaves it on the ground as cover. A dozer piles it. Hauling it off means trucks, loading time and tip fees, which is why it carries the heaviest factor by a distance.
Clear only what you need. It is the one lever on this page that costs nothing to pull. Every acre you leave standing is money you keep, and mature trees near a house are worth more standing than the clearing saves.
What the inputs mean
Area to clear
Clear only what you need. Clearing is priced by the acre and every acre you leave standing is money you keep.
Vegetation
Trunk diameter matters more than tree count. A machine that mulches six-inch stems will not touch a two-foot oak.
Method
Mulching leaves the material on the ground as cover. Hauling off means trucks, tip fees and a much bigger bill.
What this estimate does not include
- Stump grinding or removal, which is usually quoted separately
- Grading or leveling once the vegetation is gone
- Burn permits, where burning is even allowed
- Erosion control, which several counties require on cleared ground
What comes after the clearing
Clearing is the first step on a raw lot, not the whole job. Stumps are usually quoted separately, grading comes after, and several counties require erosion control on ground that has just been stripped — which is one practical argument for mulching, since the material left behind counts toward it in many places.
If you are still at the buying stage, our raw land checklist covers what to work out before you own the problem.
